Free on-site estimates, by appointment.

USA TOP BUILDERS/

Project gallery

See the work.

Real completed and in-progress jobs across bathrooms, roofing, and exteriors. Each story stays close to the work shown, from the first tear-out to the finished detail.

Featured project

A full bathroom modernisation: the dated vanity and fixtures were stripped out and replaced with a custom dual-sink vanity.

Two stages from the same vanity project, shown side by side.

Dated pink drop-in vanity before demolition

Before

Dated vanity and fixtures before demolition

Completed rustic dual-sink vanity with marble top and matte black fixtures

After

Completed rustic dual-sink vanity and marble top

Dated pink drop-in vanity and fixtures before demolition, followed by the completed rustic dual-sink vanity and marble top.

Case study A

Primary bathroom remodel

The bathroom was taken back to the structure: demolition cleared the dated dark tile surround, sunken garden tub, and built-in cabinetry.

The sequence moved through structural preparation and rough-in, with behind-the-wall plumbing brought up to code before finishes were installed.

Exposed wall structure after the dated dark tile surround was cleared during bathroom demolition

Before

Demolition — dated surround cleared

Modernised finished bathroom after structural preparation and new finishes

After

Finished bathroom — modernised space

Exposed wall structure after the dated dark tile surround was cleared during bathroom demolitionOpen full size ↗
Demolition — dated surround cleared
Sunken garden tub and built-in cabinetry stripped during bathroom demolitionOpen full size ↗
Demolition — tub and cabinetry removed
Exposed studs and subfloor with plumbing lines visible during a bathroom rough-inOpen full size ↗
Rough-in — structure and plumbing exposed
Modernised finished bathroom after structural preparation and new finishesOpen full size ↗
Finished bathroom — modernised space
Finished bathroom with a light vanity, tub, and tiled shower areaOpen full size ↗
Additional finished view

Case study B

Walk-in shower with accessibility upgrades

The focus is safer, easier daily use: a walk-in entry with a grab bar and fold-down seat for added support.

The photos follow the shower from the framed base through glass installation to the completed accessibility details.

Neo-angle shower base set in a stud-framed alcove during the rough-in phase

Before

Rough-in — shower base set

Completed accessible walk-in shower with a grab bar and fold-down seat

After

Finished shower — safer daily use

Neo-angle shower base set in a stud-framed alcove during the rough-in phaseOpen full size ↗
Rough-in — shower base set
Frosted glass corner shower during installationOpen full size ↗
Installation — corner glass underway
Completed accessible walk-in shower with a grab bar and fold-down seatOpen full size ↗
Finished shower — safer daily use
Neo-angle shower base framed against exposed wall studsOpen full size ↗
Additional progress view
Frosted corner shower enclosure shown during a mid-installation checkOpen full size ↗
Additional glass-install view

Case study C

Custom tiled shower with frameless glass

Marble-look large-format tile is paired with a vertical hexagon mosaic accent strip and matte black hardware for a clean, tailored finish.

Production measurements, panel placement, and a protective glass treatment were part of the final detail work for a long-lasting clear finish.

Custom tiled shower installation in progress before glass enclosure work

Before

Installation — shower work underway

Completed rainfall shower with a vertical hexagon mosaic accent strip and matte black hardware

After

Finished shower — rainfall head and accent strip

Custom tiled shower installation in progress before glass enclosure workOpen full size ↗
Installation — shower work underway
Finished glass enclosure with production measurements marked before final inspectionOpen full size ↗
Detail — measured before final inspection
Frameless glass panels secured while protective sealant curesOpen full size ↗
Detail — sealant curing on glass
Completed rainfall shower with a vertical hexagon mosaic accent strip and matte black hardwareOpen full size ↗
Finished shower — rainfall head and accent strip
Completed hexagon mosaic shower with a frameless glass enclosureOpen full size ↗
Finished shower — frameless enclosure
Glass shower enclosure shown during installation with the room still in progressOpen full size ↗
Additional installation view
Glass shower enclosure with production measurements marked on the panelsOpen full size ↗
Additional measured-glass view
Frameless glass shower enclosure with tile and hardware in placeOpen full size ↗
Additional frameless-glass view
Rainfall shower with a vertical hexagon accent stripOpen full size ↗
Additional rainfall-shower view
Hexagon mosaic shower wall behind frameless glassOpen full size ↗
Additional mosaic-tile view

Case study D

Roof restoration

This photo shows a crew member working on a residential rooftop during restoration, with newly installed roof decking and insulation visible.

It is a clear example of structural-integrity and exterior work; details beyond what the photo shows are intentionally left out.

Crew member on a residential rooftop during restoration with new roof decking and insulation visibleOpen full size ↗
Restoration — decking and insulation in place

Scope note

More of the work we do.

Our other focus areas include kitchens, full home renovations, room additions, decks & outdoor living, ADUs, and custom painting.

This gallery shows a sample of recent work. More is available on request.

From the opening gallery

The original gallery photos remain here alongside the project stories.

Finished double-sink vanity installation with a broad marble-look topOpen full size ↗
Additional vanity view
Rustic dual-sink vanity with a marble top and matte black fixturesOpen full size ↗
Additional rustic vanity view
Dated pink drop-in vanity before bathroom modernisationOpen full size ↗
Original vanity view
Completed accessible shower with a grab bar and fold-down seatOpen full size ↗
Additional accessible-shower view
Sunken tub surround and built-in cabinetry during demolitionOpen full size ↗
Additional demolition view
Dark tile bathroom surround during demolitionOpen full size ↗
Additional demolition view

Start with a walkthrough

Want work like this done right?

Free on-site estimates. A deposit is due only after the contract is signed, paid by the person responsible for paying. Validity is discussed at the estimate.